The pressure testing of the Ma-Me-O Beach wastewater line (with the exception of a small section in the alley between 10th and 11th) is now complete.
The pressure test has confirmed that there are no leaks in the system.
Xandal Backhoe will be out Friday afternoon (Oct 11th) to reactivate the system and turn on your pumps.
The section that still needs to be tested will be isolated from the rest of the line until that testing is complete.  There are no active users on that section of the line at this time.

Thank you for your patience as we took the necessary steps to ensure that the wastewater system meets the required standards.