Ma-Me-O Wastewater System Update

Posted on Thursday September 05, 2019 at 04:26PM

 The Wastewater System leak has been found.  The curb stop valve at a neighbouring property has a loose connection.  The contractor will make the repair tomorrow and we expect the system to be fully operational by the end of the day Friday. 

Author: Summer Village of Ma-Me-O Beach

Category:

Back to all News

Comment on our article:

Posts By Date

Popular Posts

Categories