Wastewater System Re-Activation

Our System Operator (THS Septic and Civil Solutions) will be in the Summer Village starting this week.  They will be thawing the lines (if needed) and pressure testing the wastewater lines. When the pressure testing is complete, they will activate all of the connected systems.

The heat tracing repairs to be completed this summer, will not interfere with the operation of the system.